Harbin Terminal 2 International airport
Home » Application » GRC Projects » Curtain Wall Decoration » Harbin Terminal 2 International airport

Harbin Terminal 2 International airport

Publish Time: 2022-05-30     Origin: Site

The viaducts and the non-transparent parts of the terminal building in this project are all European-style, with many facade lines and large plate divisions, which cannot be realized by conventional stone curtain walls. And GRC can use mold to make any shape, light weight, high strength, no color difference, durability, to meet the use and decorative effects.

The panel adopts 25mm and 30mm GRC plate, and the beam adopts 50*5 angle steel. The GRC board is connected with the keel bolts, and the surrounding is sealed with silicone building sealant. The width of the glue joint is 5mm, which can effectively ensure the waterproof sealing of the curtain wall.


To achieve your infinite imagination of architecture

Contact Info

ADD: Huluhe village Changping District Beijing China.

Leave Your Message

Copyright © 2022 JUJIANG All Right Reserved.
Sitemap | Support By Leadong.com